Camp Arcadia’s De-Watering Progress.

Flood Prevention Is Working

We are very pleased to let you know that the pump for the de-watering system has been installed and is working well. Our system vacuums out the groundwater from below the foundation of the Inn, Wigwam, and Craft Shop basements. The water that is removed is being pumped into Lake Michigan. Our well house generator has been modified to power the new pump in the case of a power outage. Caretaker Franco Marano has been impressed with the system saying, “since installation, the new system has been performing as expected.” Many thanks to Franco for his efforts throughout this entire process!

Leave a Reply

Your email address will not be published. Required fields are marked *

Share the Post:

Related Posts