The Chapel on the Beach is almost done! Once the stadium seats are finished, all that’s left to do is pave the walkways and install the sound system and electrics. We hope the project will be completed by mid July.


The Chapel on the Beach is almost done! Once the stadium seats are finished, all that’s left to do is pave the walkways and install the sound system and electrics. We hope the project will be completed by mid July.
We are thrilled to welcome Emily Winkel Washburn as an Artist in Residence at Camp Arcadia during the upcoming season!
You’ve heard about the loneliness epidemic – with society becoming increasingly digital and isolated, we’re all seeing (and maybe feeling!)
Camp Arcadia
3046 Oak St.
Arcadia, MI 49613
camp-arcadia@camp-arcadia.com
p: (231) 889-4361
f: (888) 753-1922